Riveted flat-steel open equipment room cable rack, available in single-tier/double-tier and multiple widths, with multiple corrosion-resistant treatments for indoor and outdoor use, for organized routing of fiber, network, and power cables in equipment rooms.
Structural configuration:Single-layer and double-layer
Standard Width:300/400/600/800mm
Surface treatment:Hot-dip galvanized (outdoor), electro-galvanized / electrostatic powder coated (indoor)
Standard accessories:Main girders, cross-bars, hangers, supports, fasteners, and double-tier spacer columns (double-tier version only)